Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Market information natural gas/biogas / pdf / 9.63 MB

Ruling of the Federal Network Agency BK9-18/610-NCG

about the reference price methodology for the market area Net Connect Germany

Market information natural gas/biogas / pdf / 359.76 KB

TENP news — State of 06.03.2019

Price sheet, Network access natural gas/biogas / pdf / 207.84 KB

NCG Price sheet of Open Grid Europe GmbH 2019

for entry and exit contracts and internal orders pursuant to Cooperation Agreement X in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.01.2019

Price sheet, Network access natural gas/biogas / pdf / 153.08 KB

GASPOOL Price sheet of Open Grid Europe GmbH 2019

for entry and exit contracts pursuant to Cooperation Agreement X.2 in the market area of GASPOOL Balancing Services GmbH valid for shipments from 01.01.2019.

Internal order / xlsx / 65.07 KB

Internal order capacity data for 2019

contains information from joint pipelines (only in German)

Others / pdf / 4.90 MB

Annual Report 2018

Open Grid Europe GmbH

Network connection, Metering point operation natural gas/biogas / pdf / 844.65 KB

Network interconnection contract

Pursuant to Article 7 of the Gas Network Access Ordinance, network operators have to sign network interconnection contracts with operators of networks to which they are connected via a network interconnection point. The specimen network interconnection contract published by Open Grid Europe is based on the provisions of Section 2 of Part 3 (Articles 26-31) and of Part 5 (Articles 52-62) of the Agreement on Cooperation between Operators of Gas Supply Networks Located in Germany as amended on 31 March 2020 (KoV XI), which is attached to the contract as Annex 5 for information. Annexes 1 to 4 of the network interconnection contract describe in more concrete terms the provisions of Section 2 of Part 3 (Articles 26-31) of the KoV XI as provided in Article 26, Section 3 of KoV XI. The supplementary provisions describe, in particular, the exact location of the network interconnections (Annex 1), their combination (where applicable) into exit zones (Annex 4) and the technical framework applicable to the relevant network interconnection and/or the relevant exit zone (only in German).

Price sheet, Network access natural gas/biogas / pdf / 83.91 KB

NCG Amendment to price sheet of Open Grid Europe GmbH 2019

Amendment to publication of 28 September 2018. Price sheet for entry and exit contracts and internal orders pursuant to Cooperation Agreement X.2 in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.06.2019

Network connection, Metering point operation natural gas/biogas / pdf / 971.60 KB

Network connection contract

This contract governs the connection of a gas plant of a connection customer ('connectee') to the gas supply network of Open Grid Europe at the network connection point. It contains above all provisions governing the operation of, and changes to, the gas pressure regulating and metering station assigned to the network connection point, as well as the exchange of information between the parties to the contract (only in German).

Market information natural gas/biogas / pdf / 462.08 KB

TENP news — State of 04.06.2018

Market information natural gas/biogas / pdf / 25.11 KB

TENP News — State of 21.03.2018

Internal order / xlsm / 65.62 KB

Internal order capacity data for 2018

contains information from joint pipelines (only in German)

Others / pdf / 3.56 MB

Annual Report 2017

Open Grid Europe GmbH

Market information natural gas/biogas / pdf / 651.00 KB

TENP news — State of 17.11.2017

Price sheet, Network access natural gas/biogas / pdf / 230.07 KB

NCG Price sheet of Open Grid Europe GmbH 2018

for entry and exit contracts and internal orders pursuant to Cooperation Agreement IX in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.01.2018

Market information natural gas/biogas / pdf / 117.70 KB

TENP news — State of 27.09.2017

Internal order / xlsm / 67.24 KB

Internal order capacity data for 2017

contains information from joint pipelines (only in German)

Others / pdf / 2.15 MB

Annual Report 2016

Open Grid Europe GmbH

Price sheet, Network access natural gas/biogas / pdf / 194.10 KB

NCG Price sheet of Open Grid Europe GmbH 2017

for entry and exit contracts and internal orders pursuant to Cooperation Agreement IX in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.01.2017

Internal order / xlsm / 61.65 KB

Internal order capacity data for 2016

contains information from joint pipelines (only in German)