Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Market information natural gas/biogas / pdf / 528.49 KB

Product data sheet

Capacity products offered by Open Grid Europe GmbH, valid for gas transports as of 01 April 2023

Market information natural gas/biogas / pdf / 175.10 KB

Natural gas orientation values of Open Grid Europe

Status June 2023 (only in German)

Others / pdf / 1.04 MB

Annual Report 2022

Open Grid Europe GmbH

Press releases / pdf / 489.17 KB

PanEU report – Assessing the benefits of a pan-European hydrogen transmission network

Gas for Climate kicks off a large energy system modelling study assessing the benefits of a pan-European hydrogen transmission network.

Press releases / pdf / 207.15 KB

NETG completes final weld on its gas transmission pipeline from Voigtslach to Paffrath

This week saw the successful completion of the final weld on NETG's Voigtslach-to-Paffrath gas transmission pipeline in Paffrath near Leverkusen. Following acceptance by TÜV as the supervisory authority, the pipeline has now achieved technical completion and operational readiness as part of Germany's high-pressure gas transmission system.

Press releases / pdf / 235.10 KB

Gas transmission: Hydrogen successfully tested in compressor prime mover

GRTgaz Deutschland, OGE and Solar Turbines have successfully tested a low emissions Solar gas turbine as a prime mover on a natural gas compressor using hydrogen blending rates of up to 25 percent.

Press releases / jpg / 1.34 MB

Press photo: First German LNG Terminal to Open in Wilhelmshaven. German Chancellor Olaf Scholz Visits the Completed Facilities.

From left: Olaf Lies (Minister of Economics of Lower Saxony), Franz-Josef Kissing (Project Manager OGE), Thomas Hüwener (Member of the Management Board OGE), Morten Höegh (Shipping company Höegh), Christian Lindner (Federal Minister of Finance), Siemtje Möller (Parliamentary State Secretary in the Federal Ministry of Defence), Niels Fenzl (Project Manager Uniper), Olaf Scholz (Federal Chancellor), Stephan Weil (Minister President of Lower Saxony), Holger Banik (Managing Director Niedersachsen Ports), Robert Habeck (Federal Minister of Economics), Christian Meyer (Minister of the Environment of Lower Saxony), Carsten Feist (Mayor of Wilhelmshaven)

Market information natural gas/biogas / pdf / 310.53 KB

Annual Monitoring Report pursuant to KAP+

According to tenor 3 lit. b) KAP+ (BK7-19-037)

Press releases / pdf / 463.33 KB

First German LNG Terminal to Open in Wilhelmshaven. German Chancellor Olaf Scholz Visits the Completed Facilities.

Implementation in record time at ‘Germany's New Fast Pace’. German Chancellor Olaf Scholz, Niedersachsen's Prime Minister Stephan Weil, German Minister for Economic Affairs Robert Habeck, and the Federal Minister of Finance Christian Lindner attend the opening ceremony of the facilities on the North Sea shore. The project was implemented by the three companies Niedersachsen Ports, OGE, and Uniper.

Press releases / jpg / 2.26 MB

Press photo: Final weld marks completion of WAL pipeline link: System now ready to take LNG – and in future also hydrogen

From left: Thomas Hüwener (Member of the Management Board of OGE), Franz-Josef Kissing (Project Manager WAL, OGE), Olaf Lies (Minister for Economic Affairs, Construction, Transport and Digitalisation of the State of Lower Saxony), Anka Dobslaw (State Secretary in the Lower Saxony Ministry for the Environment, Energy and Climate Protection), Christoph Köhler (Commercial Project Manager WAL, OGE), Malte Tammeus (Head of Department, Wittmund District) and Helfried Goetz (Mayor of Friedeburg)

Press releases / pdf / 219.29 KB

Final weld marks completion of WAL pipeline link: System now ready to take LNG – and in future also hydrogen

WAL link completed reliably and safely in record time. WAL will help feed regasified LNG from Wilhelmshaven into the German gas grid and contribute to Germany's energy supply. H2-ready pipeline is a crucial cornerstone for Germany’s future hydrogen economy.

Market information natural gas/biogas / pdf / 757.54 KB

Ruling of the Federal Network Agency BK9-21/612

Decision ‘MARGIT 2023‘ of 02/06/2022

Price sheet, Network access natural gas/biogas / pdf / 647.60 KB

Price Sheet of Open Grid Europe GmbH for entry and exit contracts as well as internal orders in accordance with Cooperation Agreement XIII.1 in the market area Trading Hub Europe GmbH

Valid for gas shipments from 1 January 2023

Press releases / pdf / 203.73 KB

New uniform postage stamp tariff for the Trading Hub Europe (THE) market area from 1 January 2023

The gas transmission system operators (TSOs) have recalculated their network charges for the Trading Hub Europe (THE) market area applicable from 1 January 2023 on the basis of the Federal Network Agency's (BNetzA) decision entitled "Approval of the recalculation of the reference price for 2023 (REGENT recalculation 2023, BK9-22/615)".

Market information natural gas/biogas / pdf / 782.15 KB

BDEW/VKU/GEODE-Guideline / Crisis Preparedness Gas

BDEW/VKU/GEODE-Guideline (only in German)

Market information natural gas/biogas / pdf / 121.34 KB

Contractual minimum pressures and minimum temperatures at entry points

Valid for transports as of 01. October 2021 (German only)

Internal order / xlsx / 65.99 KB

Internal order capacity data for 2023

contains information from joint pipelines (only in German)

Press releases / pdf / 219.85 KB

Preparations underway for the construction of the TENP III natural gas pipeline

Working strip to be provided along pipeline route in the Palatinate Forest with logging of trees to start in November 2022. Replacement of telecommunications cables. TENP I pipe string in Rhineland-Palatinate to be replaced in 2023.

Press releases / pdf / 226.79 KB

Regional planning procedure for the Heek-Epe (HEp) hydrogen pipeline successfully completed

Münster district government considers the project to comply with regional planning guidance. A 600-metre-wide route corridor has been identified. The final route of the pipeline will be determined as part of the subsequent planning approval process.

Others / pdf / 2.96 MB

Energy management system

Energy management system certification according to ISO 50001 (only in German)